Potato Chip Waste Conveyor

Case Study: Potato Chip Conveyor

 Improving Lead Times with a Custom Fabrication The Challenge A potato chip manufacturer in Tennessee recycles their potato chip waste into an additional revenue stream, however, they were encountering long lead times and high costs to fabricate their potato chip waste conveyor systems. Process Supply was challenged to build and engineer a brand-new conveying system…

Details

Case Study: Salt Drying Heat Exchanger

 Improving Heat Exchanger Lead Time and Life Span The Challange A salt manufacturer in Virginia needed to significantly reduce the 36 week lead time of their heat exchanger fabrication. These heat exchangers are located within the manufacturer’s dryer columns and serve as the primary drying process for their salt. Consisting of eight coils, these heat…

Details
Sumitomo Gear Boxes

Case Study: Sumitomo Gear Box, Dual Orientation Solution

Parallel Gear Box Redesign for Ball Mill Application Results Dual Orientation Engineered Solution Reduced Customer’s Stores Inventory by two SKU’s Estimated Savings $65,000 Application Ball Mill Customer Mining Challenge Our customer has a ball mill application that caused them to stock multiple Gear Boxes due to varying equipment orientations within the facility. Solution Process Supply…

Details
Process Supply Logo

Our privacy policy has been updated

At Process Supply, Inc., your privacy is our priority. While we do collect some information from our customers and website visitors, we only use it to make your website browsing and purchasing experience easier. We’re in the business of selling metal, not data. So let’s talk about what we collect and what we do with…